Energy Cabin Installations

Shropshire

Oct 2014

Edge Renewables have installed many Energy Cabins where conventional plant rooms may not be an option, giving a full turnkey solution.


ETA Hack 90kW Wood Chip Boiler

Shropshire

Oct 2014

Installation of a 90kW wood chip boiler to provide the heat in both a house and cottage.


ETA Hack 200kW Biomass Boiler Install

South Shropshire

Oct 2014

Installation of a 199kW wood chip boiler to heat a farm house and storage facilities.


The Shrewsbury Club

Shrewsbury

Oct 2014

Installation of a biomass-fuelled boiler system (2 x 199kW) and a 150kW Solar PV Array


Mellington Hall Hotel

Church stoke

Oct 2014

Installation of a 199kW wood chip boiler to provide the heat and hot water for a Victorian hotel.


130kW ETA Install on the Shropshire Border

Shropshire

Aug 2014

Installation of a 130kW ETA wood chip boiler to heat a farm house and workshop on the shropshire/Herefordshire border.


Walcot Hall

Shropshire

Mar 2014

Installtion of two 199kW automated wood chip boilers to provide heat and hot water for the Hall and rented properties.


BEDWBARN

Newtown

Jan 2014

Fully automated heating system supplying two houses, a beauty salon, accomodation and a swimming pool via a 199kW wood chip fuelled biomass boiler.


Hereford Poultry Site

Herefordshire

Jan 2014

A 10 boiler installtion seperated in two purpose built plant rooms, to service a large poultry site.


Partners and accreditations